Hotel Indigo

Bath, Somerset

Hotel Indigo

Background

An extensive refurbishment of Grade I and II listed terraces into a boutique hotel. The hotel comprises 166 bedrooms, a state-of-the-art gym, garden rooms, elegant lounges, wine tasting rooms and a restaurant. Each of the bedrooms have individual characteristic design features preserving the original charm and character of the buildings.

Our Services

Base Quantum was appointed to assist the contractor’s commercial team in valuing works completed, following design changes and additional works instructed during the construction phase. Our services included:

  • Carrying out a measure of the completed works in accordance with SMM7.
  • Preparation of the final account, including works for demolitions and alterations, masonry stonework, prep and decoration, as well as roofing, sanitaryware and windows.
  • The methodical assessment and valuation of over 1,500 variations, which required diligent interpretation of drawings and instructions.

Our team also carried out an on-site measurement exercise to substantiate the vast quantities of bespoke items and materials.


Laura Hannan


Hotel Indigo

Bath, Somerset

Hotel Indigo

Hotel Indigo panel

Background

An extensive refurbishment of Grade I and II listed terraces into a boutique hotel. The hotel comprises 166 bedrooms, a state-of-the-art gym, garden rooms, elegant lounges, wine tasting rooms and a restaurant. Each of the bedrooms have individual characteristic design features preserving the original charm and character of the buildings.

Our Services

Base Quantum was appointed to assist the contractor’s commercial team in valuing works completed, following design changes and additional works instructed during the construction phase. Our services included:

  • Carrying out a measure of the completed works in accordance with SMM7.
  • Preparation of the final account, including works for demolitions and alterations, masonry stonework, prep and decoration, as well as roofing, sanitaryware and windows.
  • The methodical assessment and valuation of over 1,500 variations, which required diligent interpretation of drawings and instructions.

Our team also carried out an on-site measurement exercise to substantiate the vast quantities of bespoke items and materials.


Laura Hannan


Back